Photo Gallery for July & August 2010 - Construction Begins
Back to the gallery landing page.
Photos by Scott Weidkamp of Andgar and Holly Hinman of Whatcom Farm Friends.
|
Preparing the access road. |
Preparing the access road. |
|
The steel-reinforced floor of the digester tank, before pouring concrete. |
The steel-reinforced floor of the digester tank, before pouring concrete. |
|
The floor of the influent reception pit, which will feed into the digester. |
The steel frame of the mechanical building, which will hold the |
Going Vertical in early August! |
|
|
Jason Mitchell and Todd Andrews of Andgar install siding on the |
Installing siding on the mechanical building. |
|
The interior of the mechanical building. |
Inside the mechanical building: conduit for the control wiring |
|
Inside the mechanical building: Supply and return line |
The Swaggert Brothers set concrete forms for the south end |
|
Setting concrete forms for the digester vessel. |
Tying rebar reinforcement for the center wall of the vessel.
|
|
Spray foam insulation is staged and waiting for the |
The "acid chamber", which is the entry point for fresh cow manure and other food waste inputs in the vessel. This is where it all starts. |
|
|
|
|
|
|
|
|
|